Train courier tracking, also known as railway parcel tracking, refers to the shipment monitoring system for parcels transported through Indian Railways’ extensive network. Parcels consist of small packages which are carried mainly by passenger carrying trains on Indian Railways (IR). As of now, parcel booking/delivery is allowed at around 750 stations over Indian Railways. Understanding how to track your train courier ensures you stay informed about your shipment’s journey through India’s vast railway network.
What is Train Courier Tracking?
Indian Railways’ Online Parcel Services enable customers to book and track parcels transported through passenger trains. The parcel management system includes barcoding on each consignment for train parcel tracking, with status updates transmitted through GPRS network from mobile devices by scanning barcodes. Each parcel receives a Progressive Reference Record (PRR) number that serves as the tracking identifier throughout the journey.
How to Track Train Courier Shipments
Method 1: Official Indian Railways Parcel Website
Visit www.parcel.indianrail.gov.in for official tracking:
- Navigate to the Indian Railways parcel website
- Locate the tracking or status inquiry section
- Enter the Progressive Reference Record (PRR) number mentioned in Parcel Way Bill (PWB)/Luggage Ticket (LT) given to the consignor at the time of booking
- Click “Track” or “Check Status” button
- View comprehensive shipment details including booking, loading, transit, and delivery status
Method 2: Third-Party Tracking Platforms
Also Track: Transpeak Courier Tracking
Use courier aggregator websites for convenient tracking:
- Access multi-courier tracking websites that support railway parcels
- Enter your PRR number or tracking number
- Select “Indian Railway Parcel” from courier list if required
- View real-time status updates
- Bookmark tracking page for easy reference
- Set up email or push notifications for status changes
Method 3: SMS Notifications
SMS sent to customers (both sender and receiver) at each stage from train parcel booking, loading, unloading to delivery on a registered mobile number given at the time of booking:
- Provide mobile number during parcel booking
- Receive automated SMS at key checkpoints
- SMS includes current location and status
- Save messages for tracking history
- No internet connection required
Method 4: Mobile Application
Android-based Mobile application is available for the comfort of customers:
- Download Indian Railways parcel tracking app
- Enter PRR number or tracking details
- View real-time updates on mobile device
- Enable push notifications for alerts
- Access booking and tracking from smartphone
Method 5: Station Inquiry
Contact railway parcel office for manual tracking:
- Approach the Chief Parcel Supervisor of the concerned Railway station
- Provide PRR number and booking details
- Receive verbal updates on parcel status
- Check physical location at sorting hubs
- Inquire about expected delivery timeline
- Report any delays or issues directly
Train Courier Tracking Number Format
Understanding railway parcel tracking numbers:
| Number Type | Example | Location | Description |
|---|---|---|---|
| PRR Number | 123456789012 | Parcel Way Bill | Primary tracking identifier |
| PWB Number | PWB/2024/123456 | Parcel Way Bill | Booking reference |
| Luggage Ticket Number | LT/SRC/123456 | Luggage Ticket | Alternative tracking ID |
| Consignment Number | CNS123456789 | Booking receipt | Consignment identifier |
Train Courier Tracking Status Meanings
Understanding railway parcel status updates:
| Status | Meaning | Action Required |
|---|---|---|
| Booked | Parcel registered at origin station | Wait for loading confirmation |
| Loaded | Package loaded into train | None required |
| In Transit | Moving through railway network | Monitor progress |
| Reached Junction | Arrived at major railway hub | None required |
| Under Clearance | Documentation or inspection process | Provide documents if requested |
| Arrived at Destination | Reached destination station | Visit station for collection |
| Ready for Delivery | Available for pickup | Collect from parcel office |
| Delivered | Successfully handed to recipient | Verify receipt |
| Detention | Parcel held due to issue | Contact station immediately |
| Over-carried | Missed destination station | Contact destination parcel office |
| Return in Transit | Being sent back to origin | Contact sender urgently |
Train Courier Delivery Time in India

Railway parcel delivery timelines vary by route and train type:
| Route Type | Travel Distance | Average Delivery Time | Train Type |
|---|---|---|---|
| Within State | 200-500 km | 1-2 days | Passenger trains |
| Metro to Metro | 500-1500 km | 2-4 days | Express trains |
| Long Distance | 1500-2500 km | 3-5 days | Mail/Express |
| Cross-Country | 2500+ km | 5-7 days | Superfast/Express |
| Same City | Local | Same day/Next day | Local trains |
| Rajdhani Route | Major metros | 1-2 days | Rajdhani trains (fastest rail freight) |
Factors Affecting Delivery Time:
- Parcel booking is normally allowed in all passenger trains with scheduled stop of at least 05 minutes at the station
- Train frequency on specific routes
- Number of connecting trains required
- Station stoppage duration for loading/unloading
- Distance between origin and destination
- Type of train service (express, superfast, passenger)
- Weekend and holiday schedules
- Weather conditions affecting rail operations
- Documentation clearance for certain goods
Items Allowed in Train Courier
Indian Railways carries almost all commodities like Fruits and Vegetables, Food grains, Fish, Poultry items, Electrical items, Cycle, Motorcycle, Scooter, Rickshaw, Machinery items, Medicines, House Hold Goods etc.
Commonly Transported Items:
| Category | Examples | Special Requirements |
|---|---|---|
| Household Goods | Furniture, appliances, kitchenware | Proper packaging required |
| Two-Wheelers | Bikes, scooters, motorcycles | Documentation needed |
| Electronics | TVs, computers, electronic items | Fragile marking essential |
| Perishables | Fruits, vegetables, food items | Quick transit, proper packing |
| Documents | Papers, books, files | Secure packaging |
| Machinery Parts | Industrial equipment, spare parts | Weight verification |
| Agricultural Products | Seeds, grains, produce | Seasonal availability |
Prohibited Items:
Commodities listed in Red Tariff, offensive, contraband, dangerous, explosive, inflammables, etc. are prohibited for carriage as parcel
Train Courier Booking Process
The parcel management system at www.parcel.indianrail.gov.in has an advanced user-friendly interface. A 120 days advance parcel booking facility is being enabled for parcel space:
Step-by-Step Booking:
- Registration: Register and Login to the Portal at www.parcel.indianrail.gov.in
- Online Forwarding Note: Generation of forwarding notes online by registered customers with approximate fare estimate
- Documentation: Execute a document known as ‘Forwarding Note’ duly furnishing details of the consignments to be booked as well as details of the consignor and consignee
- E-way Bill: An undertaking in the prescribed format shall be furnished stating that e-way bill will be generated and produced before taking delivery. However, if value of the consignment is less than Rs. 50,000/-, an undertaking to this effect shall be given by the consignor
- Advance Booking: Parcels can be booked upto 4 hours prior to the scheduled departure of the trains from that particular station
- Payment and Receipt: Complete payment and receive Parcel Way Bill with PRR number
Train Courier Pricing Structure
Parcel rates vary with the class of train and are categorised into P-scale, R-scale and S-scale:
| Tariff Scale | Train Type | Rate Range | Best For |
|---|---|---|---|
| P-Scale | Premium trains (Rajdhani, Shatabdi) | Higher rates | Fast delivery |
| R-Scale | Regular express trains | Medium rates | Standard delivery |
| S-Scale | Passenger trains | Lower rates | Economy delivery |
Pricing Factors:
- Weight and dimensions of parcel
- Distance between origin and destination stations
- Type of train and tariff scale
- Value declaration for insurance
- Special handling requirements
- Packaging charges if railway provides
Cost Advantage:
Train cargo services in India are widely used by traders, small businesses, and even individuals because they are affordable compared to road or air transport. They are cheaper than air freight, have large capacity for heavy consignments, and are safer for long-distance transportation
Common Train Courier Tracking Issues
PRR Number Not Showing Results
Causes:
- Incorrect PRR number entry
- Parcel not yet loaded into train
- System update delay after booking
- Wrong tracking platform
- Booking cancelled or modified
Solutions:
- Verify PRR number from Parcel Way Bill
- Wait 12-24 hours after booking for system update
- Check official railway parcel website
- Contact origin station parcel office
- Confirm booking status with railway staff
No Tracking Updates for Days
Causes:
- Parcel in transit between major junctions
- Train delays affecting schedule
- Manual handling without scanning
- Weekend or holiday causing delays
- Limited scanning infrastructure at smaller stations
Solutions:
- Check train running status for delays
- Contact junction stations on route
- Call destination parcel office
- Visit origin station for manual inquiry
- Check if parcel requires train change
Parcel Over-Carried
Causes:
- Insufficient unloading time at destination
- Mislabeling or incorrect routing
- Confusion during busy periods
- Similar station names causing error
- Staff oversight during unloading
Solutions:
- Contact destination station immediately
- Track which station parcel reached
- Request return shipment in next train
- Visit station where parcel currently located
- File complaint for delayed delivery
Detention or Clearance Issues
Causes:
- Missing or incomplete documentation
- E-way bill not generated
- Value declaration issues
- Restricted items requiring verification
- GST documentation problems
Solutions:
- Provide all required documents promptly
- Generate e-way bill if value exceeds Rs. 50,000
- Contact parcel office for specific requirements
- Clarify contents if verification needed
- Ensure GSTN verification completed
Packaging Requirements for Train Courier
All parcels must be securely packed in boxes, trunks, strong baskets or strong gunny, etc., so as to withstand the strain of handling and transferring incidental to their transportation by rail. For certain commodities special packing conditions have been prescribed in the I. R. C. A. Coaching Tariff:
Packaging Guidelines:
| Item Type | Packaging Requirement | Additional Notes |
|---|---|---|
| Electronics | Sturdy boxes with cushioning | Mark as “Fragile” |
| Two-Wheelers | Proper covering, fuel drained | Remove battery if required |
| Perishables | Ventilated containers | Quick transit needed |
| Household Goods | Strong boxes or trunks | Secure all loose items |
| Machinery | Crating for heavy items | Weight properly distributed |
| Documents | Sealed envelopes or boxes | Waterproof packaging |
Delivery and Collection Process
Parcel Way Bill (PWB)/Luggage Ticket (LT) given to the consignor at the time of booking of the parcel alongwith e-way bill (if applicable) are required before taking delivery at the destination:
Collection Requirements:
- Original Parcel Way Bill or Luggage Ticket
- Valid identification proof
- E-way bill (if applicable)
- Authorization letter (if someone else collecting)
- Payment of any pending charges
Delivery Options:
- Station-to-station (most common)
- Door-to-door (through courier partners)
- Self-pickup from destination station
- Authorized person collection
Railway Parcel Service Advantages
Benefits of railway courier service include: Transparency – Customers know where their goods are. Reliability – Indian Railways has an extensive and trusted network. Affordability – Lower courier charges compared to air or road. Convenience – Tracking is available online 24/7
Additional Advantages:
- Indian Railways is the most environment friendly mode of land transportation system
- Extensive network reaching remote locations
- No traffic delays unlike road transport
- Suitable for heavy and bulk consignments
- Higher weight capacity per shipment
- Secure transportation in dedicated compartments
- Lower risk of damage compared to road
- Committed to offer most competitive rates for transportation and timely delivery of parcels
Rajdhani Train Parcel Service
Rajdhani Rail Parcel is considered to be the fastest and reliable mode of railway transportation for moving goods. The average speed of Rail is 90km per hour which makes it the fastest rail freight:
Rajdhani Parcel Benefits:
- Fastest railway logistics option
- Premium cargo service
- Reliable and timely delivery
- Connects major metros directly
- Higher tariff but faster transit
- Dedicated cargo handling
- 24-hour operational hubs at stations
Service Coverage:
Delhi Cargo Courier Services Ltd is an authentic agent of Rajdhani Train Parcel Service since 2011, offering door-to-door facility by partnering with courier service partners like Blue Dart, DTDC, and FedEx
Modernization of Railway Parcel System
Indian Railways has undertaken modernization of the Parcel Management System with several technological improvements:
Recent Enhancements:
- Enhanced and upgraded user-friendly interface for public website on www.parcel.indianrail.gov.in
- Provision of 120 days advance railway parcel booking space has been enabled in PMS showing availability of parcel space on the online e-forwarding note module
- Parcel or luggage booking at stations through computerized counters with automatic capturing of weight through electronic weighment
- Online GSTN verification of the sender through the GSTN portal at the time of railway parcel booking
- Real-time tracking with barcode scanning
- Mobile application for customer convenience
- FSLA module for newspaper and magazine registration
How to File Complaints for Railway Parcels
If you experience issues with railway parcel service:
Step 1: Station Level
- Contact Chief Parcel Supervisor at station
- Provide PRR number and booking details
- File written complaint at parcel office
- Note complaint reference number
- Request resolution timeline
Step 2: Divisional Level
- Escalate to Divisional Commercial Manager
- Submit detailed complaint with evidence
- Include tracking history and documentation
- Follow up regularly for updates
Step 3: Zonal Railway
- Contact Zonal Railway headquarters
- Write to Chief Commercial Manager
- Attach all previous correspondence
- Request investigation and compensation
Step 4: Railway Board
- Final escalation to Railway Board
- Submit through official channels
- Provide complete case documentation
- Request urgent intervention
Step 5: Consumer Forum
- File case in consumer court if unresolved
- Claim compensation for losses
- Provide evidence of negligence
- Seek legal redressal
Common Complaint Types:
- Lost or missing parcels
- Damaged goods upon delivery
- Excessive delays beyond schedule
- Over-carriage to wrong station
- Detention without valid reason
- Improper handling causing damage
- Documentation issues
- Billing or payment disputes
Tips for Effective Train Courier Tracking
For Senders:
- Proper Documentation: Keep original Parcel Way Bill safely and take clear photographs
- Accurate Information: Provide complete and correct consignee details with phone number
- Secure Packaging: Follow railway packaging guidelines strictly to prevent damage
- Advance Booking: Book early to ensure space availability, especially during peak seasons
- Track Regularly: Monitor PRR number daily during expected transit period
- Communication: Inform recipient about booking details and expected arrival
- Insurance: Declare proper value for compensation in case of loss or damage
- Documentation Ready: Keep e-way bill and other documents prepared before booking
For Recipients:
- Stay Informed: Get booking details from sender including PRR number and train details
- Monitor Arrival: Track parcel status and check when it arrives at destination station
- Quick Collection: Collect parcel promptly to avoid detention charges
- Bring Documents: Carry identification and authorization if collecting for someone else
- Inspect Before Accepting: Check package condition at station before taking delivery
- Report Damage: File complaint immediately if parcel is damaged
- Keep Receipt: Retain delivery receipt for future reference
Future of Train Courier Services
Indian Railways continues to modernize parcel services:
Expected Improvements:
- Expanded online booking to more stations
- Enhanced real-time GPS tracking
- Integration with logistics aggregators
- Improved last-mile delivery partnerships
- Digital payment integration
- Automated sorting at major hubs
- AI-powered route optimization
- Blockchain for transparent tracking
- Drone delivery for last-mile in remote areas
- Enhanced mobile app features
Market Expansion:
Currently, railways earn Rs 2,000 crore annually from parcel business, while India’s total parcel market is worth Rs 25,000 crore. Railways aim to significantly increase participation in this market with competitive pricing 20 percent cheaper than competing modes
Frequently Asked Questions (FAQs)
1. How can I track my train courier without a tracking number?
You cannot track railway parcels without the PRR (Progressive Reference Record) number or tracking details from your Parcel Way Bill or Luggage Ticket. These numbers are essential for tracking. If you’ve lost your booking receipt, visit the origin station’s parcel office with your identification, booking date, and consignor/consignee details.
2. What is the average delivery time for train courier in India?
Railway parcel delivery time varies by distance and train type. For distances under 500 km within the same state, expect 1-2 days. Metro-to-metro deliveries typically take 2-4 days for distances of 500-1500 km. Long-distance shipments over 1500 km usually require 3-5 days, while cross-country parcels exceeding 2500 km take 5-7 days.
3. Can I send my bike or scooter through train courier service?
Yes, you can send two-wheelers like bikes, scooters, and motorcycles through Indian Railways parcel service. You must drain all fuel from the vehicle, remove or disconnect the battery, and provide proper covering or packaging. Required documents include the vehicle’s Registration Certificate (RC), insurance papers, and your identification.
4. What should I do if my railway parcel is over-carried to the wrong station?
If your parcel is over-carried (missed the destination station), immediately contact the destination station’s parcel office with your PRR number. They will locate which station your parcel reached and arrange return shipment on the next available train back to your destination. Track the parcel’s current location using the PRR number on the railway website.
5. How much does it cost to send parcels through train courier in India?
Railway parcel costs depend on weight, distance, train type, and tariff scale. Rates are categorized as P-scale (premium trains like Rajdhani/Shatabdi with higher but faster service), R-scale (regular express trains with medium rates), and S-scale (passenger trains with lowest rates).